SOLAR PERMITS
Building permits are issued for the installation of photovaltaic systems. Submit two copies of the plans and supporting documents along with the Solar permit form or available at the Building Department. In addition to the paper copies, submit a pdf of the plans to
[email protected].
The fees for those permits are a flat fee set by the City Council to incentivize PV installations, rather than the project cost based fee of a general building permit. There are minor additional project cost based fees mandated by the State of California, so the fees are different for each project. Contact the Building Department for the exact fees for your project. We accept exact cash or check for payment of fees. Currently, credit cards are not accepted.
The usual processing time for a solar permit is 7-14 days. If you are submitting an Expedited Solar application, those are processed in 3 days or less. See the submittal requirements for the Expedited Solar Permit Application.
SUBMITTAL REQUIREMENTS FOR EXPEDITED SOLAR PERMIT:
Solar PV Permitting Requirements for Streamlined Review
Eligibility Checklist for Expedited Solar Photovoltaic Permitting for One- and Two-Family Dwellings
Solar PV Standard Plan-Simplified Microinverter and ACM Systems for One- and Two-Family Dwellings
Solar PV Standard Plan- Simplified Central/String Inverter Systems for One- and Two-Family Dwellings
Structural Criteria for Residential Rooftop Solar Energy Installations
Solar PV Building Permit Application
Solar PV Installation Affidavit
ELECTRIC VEHICLE CHARGER PERMITS
For more information on Electric Vehicles please visit this page.
Building permits are issued for the installation of EV chargers are related work. Submit two copies of a site and/or floor plan showing the location of the EV chargers and the path of the wiring form the main panel, information o the charger unit and an electrical load calculation for the house along with Solar permit form. There is a load calculation available or you can submit an equivalent calculation.
The fees for the EV charger permit is based on the project value. Contact the building Department for the exact fees for your project. We accept exact cash or check for payment of fees. Currently, credit cards are not accepted.
The usual processing time for a EV charger permit is 7-14 days. If you are submitting an expedited EV charger application, those are processed in 3 days or less. See the submittal requirements for the Expedited Solar Permit application.
SUBMITTAL REQUIREMENTS FOR STREAMLINED ELECTRIC VEHICLE CHARGING PERMIT PROCESS:
Building Permit Application
Streamlined EV Charger Permitting Process
Streamlined EV Charger Eligibility Checklist
Electric Vehicle Charger Service Load Calculator